Follow Us:
Call Us: +91 9960443246
 
     
   
 
logo
 
     
   
 

Our Services

Home / Our Services

3D Modelling

  • Intelligent Modelling with tag nos. for Equipments, instruments, line numbers etc.
  • Civil & Structural including Foundation
  • Equipments with Supports & Mountings
  • Piping with in-line instruments & supports
  • Pipe Rack/Trestles/Sleepers/Trenches
  • Roads/Pavements/Accessways
  • Erection & Maintenance Equipments
  • Electrical Panels/MCC/JBs etc.
  • Cable Tray Routing
  • Extraction of Layouts, Isometrics, Supports, MTOs
  • Model reviews, clash checks
  • Walk through checks & presentations

Basic Engineering

  • Preparation of PFD/HMBD/UDD
  • Development of Piping & Instrumentation Drawings
  • Design Basis Reports
  • Equipment Sizing Calculations
  • (Eg. Pumps, Tanks, Heat Exchangers etc.)
  • Pipe sizing and Pressure Drop Calculations
  • Preparation of Procurement Specifications
  • of General Equipments & Bought-Outs
  • Piping Material Specifications/Valve Specifications
  • Development of Plot Plan with multiple options
  • Development of Equipment Layouts

Detail Engineering

  • Piping Design Basis
  • Preparation of Piping Layouts (Plan and elevation)
  • Piping Stress & Flexibility Analysis including very high temperature, pressure lines and lines connected to high speed rotating equipment
  • Specifications for Spring Hangers, Expansion bellows
  • Piping Load data for Civil/Structure Design
  • Fabrication Isometric Drawings and details
  • Piping Support Schedule
  • Support Layouts & Detail Drawings
  • Material Take-off
  • Insert Plate Layouts/Floor Cut-Outs Drawings

Detail Engineering- Electrical and Instrumental

  • Preparation of SLD & Electrical Load List
  • Cables/Cable Tray Sizing & Selection
  • Procurement Specifications of Motors, Panels & Actuators etc.
  • Development of General Arrangement Drawings
  • Instrument Schedule & Instrument Datasheets
  • Hook-up Drawings
  • Cable Tray Routing & Layouts
  • Cable Tray Support Details & Drawings
  • Material Take off
 
     
5498 Times Visited